Lesson 9 Review

  1. The _______ report is available for all or most of the tabs:
    1. Excel Inspection Overview
    2. Excel Issues per Phase
    3. Generate PDF 
    4. Excel Issue Overview
  2. Which report shows items progress in a tabular color-coded view, conditioned by status/date?
    1. Excel Cx Item Overview
    2. Excel Inspection Overview
    3. Excel Item Pivot table
    4. None of the above
  3. When using the Generate PDF Report, the selection options for Comments, Connected Records, and Attachments must always be checked?
    1. True
    2. False

Lesson 9 Summary

As a result of this lesson, you can:

  • Access Reports
  • Generate Excel and PDF reports
  • Review Reports